Hills & Heights
Forest Hill Avenue Improvement Project Lane Closures Start August 20th
The stretch between Powhite Parkway and Hathway is about to get a lot more congested. Eventually, we’ll have a much safer more beautiful stretch of road but to get there is going to require some inconvenience. The most important improvement will be the addition of sidewalks along a stretch of road that is sorely needed.
The Official DPU statement:
The Forest Hill Avenue Improvement Project construction, from Hathaway Road to Powhite Parkway, will officially begin on August 20, 2018. Expect increased construction activity within the next two weeks until February 2020. Blakemore Construction is the contractor for the roadway improvements. Expect lane closures between 9:00 AM and 3:00 PM, Monday through Friday; and between 9:00 PM and 5:30 AM any day of the week. Obey construction signage and consider alternate routes to avoid traffic congestion.
Full scope of the Forest Hill Ave. improvements from Powhite Parkway to Hathaway Road:
Scope:
The project scope is to improve safety, accessibility, drainage, multimodal transportation and aesthetics through the corridor.
Installation of a 12′ raised median (with median trees and other landscaping)
4 – 11′ wide travel lanes
Curbing (both sides)
Storm sewer (underground)
4′ planting strip (with street trees)
4′ sidewalks (both sides)
5′ bike lanes (both sides)
Pavement markings
Traffic Signal at Melbourne Drive synchronized with Hathaway Road (to ease the left turn from Melbourne Drive).
“FH UDC Application Completed”
Geotechnical Study: “60K-0679r1 Complete Report”
Categorical Exclusion: “Forest Hill Ave. CE Environmental Document 122712”
Noise Study: “Forest Hills Ave. Noise Summary 7-12-11”
Design Contract and Memos: Original Contract: “Contract #07043B-1 Stantec – Signed”
Contract Memo 1: “Contract Modification (07043B-1) (dated 8-8-12) (fully executed)”
Contract Memo 2: “Contract Modification (07043B-1) (dated 9-28-12) (fully executed).pdf”
Contract Memo 3: “Contract Modification (07043B-1) (dated 5-30-13)”


